• Rank: Newbie
    • The Contractor Will Be Replacing The Worn Out Roof Along With Flashing By Chimney And On Sides.
    • The Siding Above The Cement On The Exterior Will Be Replaced.
    • The Entire Exterior Will Be Painted.
    • The Fencing That Is Loose Will Be Repaired To Be Stable.
    • There Are 3 Windows Stuck Shut That Will Be Replaced.
    • The Front Door And Back Door Will Be Replaced Along With The Trim.
    • The Inside Will Be Demolished In The Kitchen And Bath Area And All New Cabinets, Counters, Fixtures Will Be Installed.
    • All Interior Walls And Trim Will Be Painted.
    • Electrical Outlets For GFCI Will Be Added Around Water.
    • New Toilet And Shower In The Bathroom.
    • New Appliances And Hardware And Lights Will Be Added As Well.