Need Railing Moved And Flooring Installed

Client Name: Justin

Luxury Elevators and Construction

What do you need included?:
Labor
Material
    • Need Railing Marked In Red To Be Moved To Area Marked In Green.

    • Reuse Removed Railing If Possible.

    • Need Matching Hardwood Flooring Installed Where Flooring Is Missing.

    • Flooring Needs To Be Installed In Two Locations.

    • In The Second Location, Flooring Needs To Run Up To The Edge Of The Ledge.

You must sign in to apply for this position.