jungkyu.kim posted a new job Final Cleaning 1 month, 1 week ago
Floor and wall cleaning
ASSEMBLY: 232,536.94 SF
FORMATION: 56,713.83 SFThe quantities are calculated based on floor area.
Cleaning must include the walls, so please refer to the drawings to confirm the height of the wall sections.
One 49′ scissor lift will be required and should be included in the quotation.
Cleaning equipment…[Read more]
-
jungkyu.kim posted a new job Toilet Partition Installation 1 month, 1 week ago
Installation of toilet cubicle partitions at the SK Battery Kingston site
Assembly
– Toilet Partition : 2,104 SF
– Urinal Partition : 18 EAFormation
– Toilet Partition : 1,291 SF
– Urinal Partition : 12 EACubicle partitions and Urianl partitions (Material) will be provided by KUKBO Design
Screws, adhesives, tools, equipment, and…[Read more]