• Floor and wall cleaning

    ASSEMBLY: 232,536.94 SF
    FORMATION: 56,713.83 SF

    The quantities are calculated based on floor area.

    Cleaning must include the walls, so please refer to the drawings to confirm the height of the wall sections.

    One 49′ scissor lift will be required and should be included in the quotation.

    Cleaning equipment…[Read more]

  • Installation of toilet cubicle partitions at the SK Battery Kingston site

    Assembly
    – Toilet Partition : 2,104 SF
    – Urinal Partition : 18 EA

    Formation
    – Toilet Partition : 1,291 SF
    – Urinal Partition : 12 EA

    Cubicle partitions and Urianl partitions (Material) will be provided by KUKBO Design
    Screws, adhesives, tools, equipment, and…[Read more]

jungkyu.kim

Profile picture of jungkyu.kim

@jungkyu-kim

Active 2 weeks, 2 days ago